Saturday, January 22, 2011

Timber delivered into garage

Went by last night. All that seems to have happened is the delivery of a out 12 90x45 pine timbers. Our thought is that these may be to finish off the alfresco decking. It is supposed to have a border around. However it appears that our carpenter didn't allow for this. Hopefully now that the timber and the picture railing have arrived there is nothing else that the carpenter needs to wait for. Bring on fixing invoice?


- Posted using BlogPress from my iPhone

Thursday, January 20, 2011

Picture Rails Delivered

Her indoors has just been past the house and apparently the picture rails have been delivered.  I also received a letter from Romeo today stating that extra nails have been put in the floor boards, the overhang has been fixed and the other items from our letter are being looked into.  I will have to double check that these have been done.

Tuesday, January 18, 2011

Gas underground

It looks like our gas supply has been installed underground.



We had a lovely chat with our neighbors about our fence. They said that nothing had happened on Monday however they did notice a truck pull up but when the driver noticed that no one was around they just drove off.

- Posted using BlogPress from my iPhone

Sunday, January 16, 2011

Whose bare feet are these?

Had a look around inside yesterday to see if anything else had happened. Nothing seemed to have been done inside however I saw these footprints.



There was a lot of mud at the entrance so I thought maybe someone had come in to have a look around and were kind enough to make less mess. However these footprints went everywhere throughout the house. Even right up to the toilet window. It seemed as though someone may have been doing a detailed look at everything. Being optimistic I am assuming that it may have been the site supervisor back from leave.

The builders office opens on Wednesday so we will see how they respond to my queries from before Christmas.

I also took a few photos of the completed garage floor.



This is looking from the wip door.



The finish looks pretty good and I think that they may have sloped it slightly to the front. The also put a good little slope near the back roller door.

- Posted using BlogPress from my iPhone

Friday, January 14, 2011

Garage (warning male nudity)

We are currently trying to figure out what to do with our fences.  Our poor neighbours to the South have had to cope without a fence along their property for almost a year now and we want to try to alleviate this before the end of the build.  So we have been talking to fencers to see what is best.  Following this her indoors phoned our neighbours this morning to talk about fences which I will post about later.  They told us though that concreters were at the house doing our garage.

Immediately her indoors packed the kids into the car and headed off to site.  As she left it started to pour with rain.  This is the only photo she managed to take on her iphone.
As you can see the inclement weather has forced the concreters to take action.  They have finished the garage, however apparently in a clothing optional way.  As her indoors was leaving, however, apparently they got a little tired of someone taking photos of them so they wrapped themselves in garbage bags.  Unfortunatley her indoors was too embarrassed to take photos of this but the garbage bags were quite large and the poor guys ended up looking like they were wearing dresses.

I'll post more about the garage and the fences later.

Friday, January 7, 2011

Record of Progress

I have started to put together a page on this blog to track what happened on every day. I will start to back date it when I next get a chance (and also when I can get my spreadsheet off her indoors laptop).

This will be very useful for the upcoming argument on inclement weather.  Anyone in the process of building, I would thoroughly recommend undertaking this, hopefully it will just be an interesting thing to review when you move into the house rather than something necessary for having a fight with your builder.

Wednesday, January 5, 2011

Tracking progress? Use a blog.

If you are building a house I strongly recommend that you blog about it. The other day I reread the whole blog. This was with an aim to compare the rain records from bom with what I had recorded as happening. It seems to me as though they only really worked when there was a lot of rain and the site sat idle during clear and dry weather. This is awesome evidence in a fight about inclement weather.

Also in my review I learnt a lot about some other aspects which I had forgotten about. An example was when I took a photo of the lintel delivery slip. I commented back then that I thought that they didn't have enough of a certain length. The brickie eventually discovered this and they had to order more. Now we have a few spare angel sections sitting around.

Yesterday I popped by twice. The first time I thought I saw a car leaving the site but I had a quick look around.


They had cleaned up a lot inside which may mean they are getting ready for painting. Also the bulkhead above the fridge cavity has been installed.


There is a lining for the roof access in the laundry.


The linen cupboard now seems to have the facia piece added and is now much stiffer.

The chippy now just needs to finish off the walk in robe shelving and inside is all done. He then needs to finish the deck and then the verandah.

- Posted using BlogPress from my iPhone