Things are progressing really well now.

The brickies finished up most of their work on Monday morning whilst at the same time holes for the stumps were being augured.
The timber and stumps were also delivered
We went by last night and measured things up.  All of the spacing of the stumps seemed to be in accordance with AS1684.2.
This morning by about 10:00AM almost all of the joists were in place on top of the bearers.

This is the view through the garage.  I wonder what they will use for the wall between the house floor and the garage slab? 
  
The view below shows the finished floor.  Not the different section on the left.  I think that this is the shower recess.