Got sent these photos during the day from her indoors.
The first two were in the morning and the last was by 3:30. Not bad for a days work.
I also phoned the builders office to see if I could get the engineers design for the frame. Here is an extract of the extent of what they have:
Note that the above "engineering" states "conventional timber flooring to AS1684. I was expecting a little more. It would be like a bridge engineer showing on a drawing Point A and Point B with a line between stating "bridge to AS5100" It would make the engineers job a lot easier, however I wouldn't want to be the people constructing the bridge.